Building project; submission of documents for exemption from approval

Building application online
Please note in particular our information under:
  • Brief description

    You generally need a building permit to erect, modify or change the use of a facility. Under certain conditions, your building project may be exempt from the obligation to obtain planning permission.

  • Description

    In principle, exemption from approval can be granted for all structures except for special structures. However, this is only possible under certain conditions (see "Conditions"). However, even if a project is exempt from approval, it must still comply with all applicable regulations.

    Even if all the requirements for an exemption from approval are met, you are not entitled to such an exemption. It is at the discretion of the municipality to decide whether or not a building permit procedure should be carried out.

    Special information for - District of Bad Tölz Wolfratshausen

    Please give priority to using the online service above via the "Online building application" button.

    Under the further links you will find the page reference to the "Building application procedure".

    The "FAQ on the digital building application procedure" with numerous questions + answers can be found in the Forms section.

  • Prerequisites

    The construction, modification or change of use of a building may be exempt from approval under the following conditions:

    • The project is not a special construction,
    • it lies within the scope of a qualified development plan or a project-related development plan,
    • it complies with the provisions of the development plan and any local building regulations,
    • the development is secured and
    • it is not a craft or commercial construction project for which the municipality has excluded the application of the exemption from approval by means of a development plan.

    The municipality may declare that a planning permission procedure is to be carried out despite the existence of these requirements.

  • Deadlines

    There are generally no deadlines.

    However, if you only want to start construction more than four years after the construction work has become permissible due to an approval exemption procedure, you must go through another approval exemption procedure.

  • Required documents

    Current extract from the land register

    Site plan

    Not required if the application is only for changes to structural installations where the exterior walls and roofs and the use are not changed.

    Construction drawings

    Building description (for form, see "Forms")

    Fire protection certificate, if applicable

    Only required if it has been checked by the building authorities and is not already included in the other building documents.

    Any necessary information on the secured development with regard to the supply of water and energy as well as the disposal of waste water and traffic-related development

    Only required if the building project cannot be connected to a public water or energy supply or to a public waste water disposal system. Also required if the building project is not sufficiently close to a public traffic area.

    If necessary, consent to the transfer of clearance areas (see "Forms")

    Further documents may be required

    Depending on the building project, further documents may be required, for example a tree inventory declaration. However, this is only required if requested by the municipality.
  • Forms

  • Costs

    There are no fees for the permit exemption. If the municipality informs you before the end of the one-month period that no approval procedure is to be carried out, it can charge a fee for this if it has regulated this in a municipal cost statute.

  • Legal basis

  • Legal remedy

    If the municipality declares that the simplified planning permission procedure is to be carried out, you have no right of appeal against this.
  • Further links

  • Procedure

    Written submission

    First of all, please note that in the case of building applications for the construction and alteration of buildings, the building documents must be prepared by an authorized draftsman (architect, civil engineer; for smaller construction projects, especially detached and semi-detached houses, also master craftsmen in the building and carpentry trades and state-certified technicians in the field of construction technology). This also applies to documents in the approval exemption procedure.

    • Submit the required documents to the municipality in whose area the building plot is located.
    • The documents correspond to those of a building application together with building documents and must be submitted in triplicate using the forms provided.
    • Notify the neighbors of the building plot of the construction project at the latest when submitting the documents to the municipality. It is better if you involve the neighbors in advance by submitting the site plan and the construction drawings for their approval.
    • The municipality can request that an approval procedure be carried out within one month of submission of the documents. This means that the documents are automatically processed as a building application, provided you have noted this accordingly on the building application form. The lower building supervisory authority is responsible for examining and deciding on the building application.
    • However, if the municipality does not request the simplified approval procedure within one month or informs you in writing that no approval procedure is to be carried out, your project is exempt from approval.

    Digital submission

    Digital submission of documents in the permit exemption procedure is not yet possible throughout Bavaria. When selecting a location, the link to the online procedure is displayed if it is already offered.

    • The documents can be submitted digitally using the online assistant.
    • The predefined building application and building description forms are replaced by the queries in the online assistant. The building documents are uploaded to the online assistant in electronic form (files in PDF format).
    • The signatures of the client and the authorized draftsman are replaced by authentication using the "BayernID" user account or "My company account". In particular, the (large-format) construction drawings do not need to be signed. They can therefore be generated as a file directly in the CAD system of the design author. If the building documents have to be created by an authorized designer, the latter must authenticate himself and submit the documents for the client.
    • The documents are first sent to the lower building supervisory authority, which forwards them immediately to the responsible municipality. The one-month period after which the project is exempt from approval begins with the submission of the digital documents.
  • Notes

    If your building project is exempt from approval, you are responsible for ensuring that the requirements for exemption from approval are met and that public law regulations are complied with.

    Please note that you must notify the lower building supervisory authority of the start of construction at least one week in advance, even for building projects that do not require approval.

  • Processing time

    If the municipality does not inform you within one month of submission of the required documents that the simplified approval procedure is to be carried out, you may commence execution. This does not apply if the municipality applies for a provisional prohibition within one month of submission of the required documents.